BREEAM Reduction of night time light pollution
Contents |
[edit] Aim and benefits
The aim of this credit is to reduce unnecessary light pollution, energy consumption and nuisance to neighbouring properties by ensuring that external lighting is concentrated in the appropriate areas and that upward lighting is minimised.
[edit] When to consider
RIBA Stages 3-4 (Developed Design-Technical Design)
[edit] Step by step guidance
Awaiting content
[edit] Questions to ask while seeking compliance
- Does the building have external areas which require external lighting?
- Is the building an infill building on an existing site or an extension to an existing building?
- Will there be any safety or security lighting required?
- Are there any illuminated advertisements on the development site?
[edit] Tools and resources
Awaiting content
[edit] Tips and best practice
- Double-check that any drawings, schedules or specification details provided for the Health and Wellbeing: Visual comfort (external lighting section) and the Energy: External lighting credits match up with information provided for reduction of night time light pollution.
- Confirm with the end user (where known) what the site’s operational hours will be. Bear in mind that a number of industrial sites may be in operation for 24 hours a day, 7 days a week, and therefore external lighting will be required throughout the night.
[edit] Typical evidence
[edit] Design Stage Evidence
A site plan indicating external lighting (both locations of light fittings and types). A schedule of external light fittings may also be provided. For confirmation of compliance with the relevant guidance or luminance requirements at design stage, a formal letter from the electrical engineer may be provided.
[edit] Post Construction Stage Evidence
As Built issue of the external lighting plan, and confirmation of any changes to the external lighting specification since design stage (confirmation that the external lighting specification is compliant with the relevant guidance or luminance requirements).
Whilst on site, take photographs of the external light fittings and any lighting controls as required.
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- BREEAM UK New Construction 2014
- BREEAM UK Refurbishment and Fit-out 2014
- BREEAM International New Construction 2016
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
--Elisa Caton 12:55, 06 Mar 2018 (BST)
[edit] Related articles on Designing Buildings Wiki
- BRE Expert Collection 6 Daylight and shading.
- BREEAM Internal and external lighting.
- BREEAM Visual comfort Daylighting.
- BREEAM Visual comfort Glare control.
- CIBSE Case Study Hepworth Gallery Lighting.
- Circadian rhythms.
- Daylight factor.
- Daylight lighting systems.
- Extra-low voltage lamps.
- General lighting v task lighting.
- Health and wellbeing impacts of natural and artificial lighting.
- Human-centric lighting.
- Light pollution.
- Lighting and energy efficiency.
- Lighting and health infographic.
- Types of lamp.
- Types of lighting.
- Use of lighting to improve health and wellbeing.
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.