BREEAM Reduction of night time light pollution
Contents |
[edit] Aim and benefits
The aim of this credit is to reduce unnecessary light pollution, energy consumption and nuisance to neighbouring properties by ensuring that external lighting is concentrated in the appropriate areas and that upward lighting is minimised.
[edit] When to consider
RIBA Stages 3-4 (Developed Design-Technical Design)
[edit] Step by step guidance
Awaiting content
[edit] Questions to ask while seeking compliance
- Does the building have external areas which require external lighting?
- Is the building an infill building on an existing site or an extension to an existing building?
- Will there be any safety or security lighting required?
- Are there any illuminated advertisements on the development site?
[edit] Tools and resources
Awaiting content
[edit] Tips and best practice
- Double-check that any drawings, schedules or specification details provided for the Health and Wellbeing: Visual comfort (external lighting section) and the Energy: External lighting credits match up with information provided for reduction of night time light pollution.
- Confirm with the end user (where known) what the site’s operational hours will be. Bear in mind that a number of industrial sites may be in operation for 24 hours a day, 7 days a week, and therefore external lighting will be required throughout the night.
[edit] Typical evidence
[edit] Design Stage Evidence
A site plan indicating external lighting (both locations of light fittings and types). A schedule of external light fittings may also be provided. For confirmation of compliance with the relevant guidance or luminance requirements at design stage, a formal letter from the electrical engineer may be provided.
[edit] Post Construction Stage Evidence
As Built issue of the external lighting plan, and confirmation of any changes to the external lighting specification since design stage (confirmation that the external lighting specification is compliant with the relevant guidance or luminance requirements).
Whilst on site, take photographs of the external light fittings and any lighting controls as required.
[edit] Applicable Schemes
The guidelines collated in this ISD aim to support sustainable best practice in the topic described. This issue may apply in multiple BREEAM schemes covering different stages in the life of a building, different building types and different year versions. Some content may be generic but scheme nuances should also be taken into account. Refer to the comments below and related articles to this one to understand these nuances. See this document for further guidelines.
- BREEAM UK New Construction 2014
- BREEAM UK Refurbishment and Fit-out 2014
- BREEAM International New Construction 2016
BRE Global does not endorse any of the content posted and use of the content will not guarantee the meeting of certification criteria.
--Elisa Caton 12:55, 06 Mar 2018 (BST)
[edit] Related articles on Designing Buildings Wiki
- BRE Expert Collection 6 Daylight and shading.
- BREEAM Internal and external lighting.
- BREEAM Visual comfort Daylighting.
- BREEAM Visual comfort Glare control.
- CIBSE Case Study Hepworth Gallery Lighting.
- Circadian rhythms.
- Daylight factor.
- Daylight lighting systems.
- Extra-low voltage lamps.
- General lighting v task lighting.
- Health and wellbeing impacts of natural and artificial lighting.
- Human-centric lighting.
- Light pollution.
- Lighting and energy efficiency.
- Lighting and health infographic.
- Types of lamp.
- Types of lighting.
- Use of lighting to improve health and wellbeing.
Featured articles and news
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The remarkable story of a Highland architect.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building photo contest 2024 winners
Fresco School by Roman Robroek and Once Upon a Pass by Liam Man.